BAY28 Investor Inquiry

Wireless Power Transmission

The Global
Wireless
Power Grid.

Bay28 is building wireless power at global scale: usable electrical power delivered without cables, charging pads, or line of sight. Built to power the future.

Investor Inquiry The Technology

Pre-commercial · Phase 1 bench program underway · Southern California

More than a century ago, the world decided power had to travel through wires. Every grid, every substation, every charging cable since has been built on that decision.

We’re not convinced it was the right one.

Nobody gets somewhere new on paper alone. Theory tells you where to look. Only experiment tells you what’s there. So we build it, test it, break it and build it again.

We’re testing it the only way that counts: in the field, on calibrated instruments, with the numbers open to anyone who wants to check them. If we’re right, the grid of the next century won’t be built from copper.

01 — Technology

The grid, without the wires.

Not a better charging pad. A different category of power delivery: a ground-based transmitter and tuned receivers, engineered to power equipment where it works rather than where the wires end.

A

Transmitter

A fixed station that serves as the power source for a coverage area. No antenna farm, no beam to aim.

B

Receivers

Tuned receivers for fixed equipment and machines in motion. No docking, no alignment, no line of sight.

C

Platform

Power delivered as a service across a network of receivers, rather than hardware sold once.

Not this.

Wireless power has been promised many ways. Ours is none of them.

Inductive charging Pads and coils that work at centimeters
Radiated beaming Microwave, laser and RF beams aimed at a target
RF energy harvesting Scavenging microwatts from ambient signals
Ionospheric schemes Relying on the upper atmosphere as a conductor

Measured, not claimed.

Every result we report is held to one standard: transmitted and received power logged simultaneously on calibrated instruments, time-synchronized and GPS-verified, with the full power budget open to independent third-party review.

Technical materials are shared with qualified parties under NDA.

02 — Why Now

The world needs more power, in more places.

Electricity demand is climbing faster than at any time in a generation. The wires that carry it can’t be built fast enough.

Demand is surging

Electric vehicles, AI data centers, electrified industry and electrified shipping are all pulling on the same grid at the same time.

Wires can’t keep up

New lines and substations take years to permit and build, and every charger, berth and machine still needs copper run to it. Power that reaches the point of use changes that math.

Millions still live in the dark

More than 650 million people still have no electricity at all, most of them in sub-Saharan Africa, where running lines to every village may never pay off.

Clean power needs a way to travel

The best sun and wind are often far from the people who need the power. Delivering clean energy where it’s used, without new lines, is part of the problem we’re solving.

03 — Markets

Start where downtime costs most.

Initial focus

Industrial automation

Warehouse robots, AGVs and forklifts that charge while they work.

Next

EV fleets & depots

Delivery vans, buses and trucks powered at the depot without a charger build-out.

Next

Ports & maritime

Cargo ships at berth, electric ferries, cranes and yard tractors, without shore-power cabling.

Next

Mining & agriculture

Haul trucks, electric tractors and irrigation pumps working far from the nearest line.

Next

Remote infrastructure

Sensors, telecom sites and agricultural equipment beyond the reach of the grid.

Long term

Vehicles in motion

Cars and trucks drawing power as they drive. Smaller batteries, no charging stops.

Long term

Grid-constrained sites

Data centers, new developments and facilities stuck waiting on grid interconnection.

Long term

Buildings & devices

Power as a utility service, metered to the receiver instead of the outlet.

04 — Road to the Grid

From the bench to the world.

Stage 1

Bench program

Controlled testing and measurement in our Southern California lab.

In progress

Stage 2

Field demonstration

Open-ground testing under license, with every watt logged and time-stamped.

Ahead

Stage 3

Independent verification

Results reviewed and reproduced by outside experts.

Ahead

Stage 4

First commercial partner

A paid deployment with an industrial automation partner.

Ahead

Be there for the first demonstration.

Get word when Bay28 runs its first public field test.

Notify me

05 — Investor Inquiry

Talk to the founder.

We are building relationships with investors and strategic partners ahead of our field demonstration. Tell us who you are and we’ll be in touch.

Prefer email? invest@bay28labs.com

Submitting this form does not grant access to confidential information. Technical disclosure is made only under NDA.